Topic Archive: cut and cap


Cut and Cap Certification Requirements

Posted on Aug 16, 2011 and tagged:

Opinon based on NFPA 99, 2005

NFPA 99, 2005  states that all pipeline down stream of a break in the pipeline must be verified. What if the break is a cut and cap?  NFPA also states that any time the system is remodeled or repaired it should be verified to confirm that it meet the NFPA standards.